45kw burner fan asphalt batching plant with heat resistance Nomex filter pocket
Daily maintenance for cold aggregate ground hopper of hot mixing asphalt batching plant
Usual fault and elimination for cold feeding system
. fault:Belt brim is scraped or damaged.
cause:Belt gets away from centerline or frictionizes with frame.
settlement:Make revision again.
. fault:Belt moves to some special position at single side or along conveyor.
cause :Upside or underside supporting roller is installed incorrectly, namely, the install angle of supporting roller is wrong.
settlement:Readjust supporting roller
Cause :Transverse section of supporting roller or frame is not level.
settlement:Readjust supporting roller or frame.
Cause :Head and trail roller is not level or not vertical to belt.
settlement:Readjust angle of head and tail rollers
cause :Supporting roller cannot turn.
settlement:Repair or replace it.
Cause :Belt lacks of tensioning.
settlement:Tension it again.
Cause :Supporting roller is felted with material.
settlement:Eliminate those materials and adjust sweeper to get more effect.
. fault:Belt escapes to single side during run.
Cause :Belt forms arch.
settlement:Probably, it will work well during full-load run. If not, replace it.
cause :The joint is made out of the vertical.
settlement:Cut off the bad joint, reconnect the belt, and ensure uprightness for the two ends strictly.
Cause : Aggregate is not in center of belt.
settlement:Revise the chute, and make the aggregate discharge to center of belt.
. fault:Bearings in supporting-roller or tail roller are over heated.
Cause :Belt is over tensioned.
settlement:Readjust tension degree
cause :Grease is excessive in bearings
settlement:Take apart bearing, grease it less and anew.
Cause :Lack grease or maintenance.
settlement:Take apart bearing, grease it anew.
No. | Part name | Quantity | Remark |
A | Aggregate Cold feeder | ||
1 | Cold feeder (two with wall vibrator) | 5 pieces | 3-hopper-connected typer, with empty alarming funtion with signal sending to control room |
2 | Belt Feeder | 5 sets | Function of frequency control of motor speed |
3 | Collectiion Belt Conveyer | 1 set | |
4 | Inclined belt conveyer | 1 set | |
B | Drying drum and burner | ||
1 | Drum drryer(Friction Driven) | 1set | stainless steel heat perservation with 80mm rockwool |
2 | Burner | 1set | Energy Italy EB9 |
3 | 50T Diesel tank | 1set | |
C | Heated aggregate elevator | ||
1 | Heated aggregate Hoistor | 1set | |
D | Hot Material Sieving mechanism | ||
1 | Vibration Screen | 1set | USA cold riveting technology |
E | Mixer | ||
1 | Mixing Tank(Double horizontal type shaft-mounted gear reducer) | 1set | |
2 | Bitumen weighing Spray Pump | 1set | |
F | Main frame System(mixing tower) | ||
1 | Main tower accessories like Platform, Handrail And Guard Railing | 1set | |
2 | Hot Material Bins (Five Bins, Continuous level indicator) | 1set | Color steel heat-preservation |
3 | Asphalt product storage bin(with Heat-insulation) | 1set | 120T |
4 | Finished product | 1set | |
5 | Overflow & Waste Material Bins | 1set | |
G | Weighing System | ||
1 | Aggregate weighing | 1 set | American Toledo sensor, Japanese metering device |
2 | Fine material weighing | 1 set | |
3 | Asphalt weighing | 1 set | |
H | Mineral and waste material Storage Supply System | ||
1 | Filler Bin(50m3) | 1 set | With arch breaking device |
2 | Waster filler Bin(50m3) | 1 set | With arch breaking device |
3 | Waste filler elevator | 1set | |
4 | Screw Conveyer | 6 pieces | |
5 | Pneumatic butterfly valve | 3sets | WAM, Italy |
I | Dedusting system | ||
1 | Primary Volute Casing Collector | 1set | |
2 | Secondary Bag filter (Air Back-flushing) | 1set | Nomex, Dupond USA |
3 | Induced draft Fan, gas flue and Chimney(Soft Start-up) | 1set | Electronic Air Door |
J | Pneumatic Control System | ||
1 | Pneumatic part | 1set | |
2 | 2m3 Compressor | 1set | |
3 | 0.6m3 air accumulator |