Post Offer Free
WUXI XITONG TECHNOLOGY GROUP  

Gold Index: 6506

You are here: home  > Low - Carbon Green 110 Planed Material Bank Hot In Place Recycling Equipment 2KM / Day

Low - Carbon Green 110 Planed Material Bank Hot In Place Recycling Equipment 2KM / Day 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: ARHR-5120A

Low-carbon green 110 planed material bank hot in place recycling equipment with 145 paving temperature
<span st

Low-carbon green 110 planed material bank hot in place recycling equipment with 145 paving temperature

The construction process and quality control for hot in-place asphalt recycler 

1. Construction process

Multi-step asphalt road surface hot-in-place recycling regeneration unit, independently researched and developed by Wuxi Xitong Chuangfei Highway Equipment Co., Ltd, composed of two heating units, one milling unit for original road pavement, one channel heating unit, one channel milling unit, one two-layer heating unit and one lifting remixer, which are totally 7 vehicles, matched with a paver, various rollers and several dumpers to operate the hot in-place work.

. Construction preparation

 

. Original road surface heating(first layer heating)

 

. Milling and planing of original pavement (first layer milling)

Heater unit tightly follows the original pavement miller, heating plate at the front of the miller continuously reheats the original pavement, to make the heat further penetrate and soften the pavement and then carry on the first layer milling. The unit divides into left, middle and right 3 milling parts, using rotary drum type scarifying milling device, with screw-typed milling tool bit, which possesses scarifying and collecting functions. Milling depth and width can be controlled and adjusted automatically. Milling depth controls at about 2.5cm. First, side milling device scarifies and mills each 1/3 area of road mixture at both sides of recycled lane, and collects those mixture to the rest 1/3 non-milling pavement, back milling device goes on scarifying and milling the left pavement, then a bank width of which around 50cm will be automatically created. Now the bank temperature is over 120, road trough temperature exceeds 100.

 

. Road trough heating(second layer heating)

Reheat the road trough heaped with bank in the middle by using a channel heater, bank goes through from the channel set in the middle of the heater, after heating, the pavement temp. controls around 160-170.

Main performance comparison for hot in-place recyclers in current market

 

Process control Mixing Interlayer bond Safety Overall evaluation  
Heating mode Mixing mode Mixing effect Interlayer temp. Bonding effect  
Infrared heating continuous Lack of uniformity 90 With good thermal bonding

Difficult fuel adding,

hidden safety troubles

High heating temp.;

good penetration;

aging easily;

hidden safety troubles

 
Normal heated air circulation continuous Lack of uniformity 70 Bonding not good

Easy fuel adding

good safety

Tender heating temp., bad penetration

, bad temp. increasing , good safety

 
Our layered heated air circulation Batch-type even 90 With good thermal bonding

Easy fuel adding,

good safety

Front end layered heating&

Milling;

Back end layered temp. increasing

Tender heating&

good temp. increasing effect

Good safety

 
 

 

bigPhoto
 Mr. Mr. Jia Wang

Tel: 86-510-85361108
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

WUXI XITONG TECHNOLOGY GROUP [China (Mainland)]


Business Type:Manufacturer
City: Wuxi
Province/State: Jiangsu
Country/Region: China (Mainland)

You May Like:

Product (126)