Model No.: ARHR-5120A

2-3CM Pavement rapid softening hot in place recycling equipment with 100 road trough
<span style="font-size:16p

2-3CM Pavement rapid softening hot in place recycling equipment with 100 road trough

The construction craft and quality control for asphalt hot in-place recycling units 

1. Asphalt pavement recycling process

 

. Preparation before construction

 

. Original road surface heating(surface layer heating)

 

. Scarifying of original pavement (surface layer milling)

 

. Heating the Road trough(second layer heating)

 

. Road trough milling and scarifying(second layer milling)

Channel miller tightly follows the channel heater, bank pass-through mode is the same as channel heater, heating plate in front of the miller keeps on heating of the road trough, to make the heat further penetrate and soften the pavement and then mill the last 1.5cm old pavement. Milling device is the same as the original road surface miller. There is additive adding device installed at the front of the rear miller, according to designed amount, additive would be evenly sprayed onto scarified mixture, after fully mix with the old mixture, a continuous trapezoidal bank in the middle of the recycled lane would be shaped up. At this time the bank temperature is above 110, road trough temperature is above 100.

 

. Double-layer heater heats the recycled mixture

Dump truck with new asphalt mixture tightly follows the channel miller, discharges the mixture into the hopper at the front of the double-layer heater, mixture would be directly added to the trapezoidal bank as calculated quantity (fine tuning according to the sizes of ruts)by the scraper, to improve the composition and aggregate ratio of the original pavement. 40% mixture of the bank would be lifted into the upper tank for heating by the lifting device in front of that tank,remaining approximately 60% of the mixture on trapezoidal bank will be mixed, spread and loose paved on the recycled lane by spiral distributor below heating plate, the heating tank in the middle of the double-layer heater divides the mixture into two layers, upper layer mixture falls out onto the lower mixture layer from the rear exit of heating tank, at this moment the mixture temperature is around 140.

Process control Original pavement heating Original pavement milling Mixing Interlayer bond
Heating mode Heat source temp. Pavement temp. Trough bottom temp. after heating Degree of aging Milling mode Bank condition Mixing mode Mixing effect Interlayer temp. Bonding effect
Infrared heating 9001100 250300 100 serious

4-5cm

whole layer milling

110,no broken, no gray material continuous Lack of uniformity 90 With good thermal bonding
Normal hot air circulation 350550 190200 70 light 4-5cm whole layer milling 90,light broken,there is gray material continuous Lack of uniformity 70 Bonding not good
Our layered hor air circulation 350550 First layer 160180 100 light

Single layer, 2-3cm

layered milling

110, no broken, no gray material Batch-type even 90 With good thermal bonding
Second layer 160180 100 light
bigPhoto
 Mr. Mr. Jia Wang

Tel: 86-510-85361108
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com